Home     Civil Engineering Projects
 

Hydraulic Works

Tanks

CONSTRUCTION OF THE CALLE TAULAT ANTI-DSU TANK (Civil Work) AND VEHICLE PARKING
CLIENT       FORUM 2004

Section of Calle Taulat extending from Rambla Prim/Avda. Diagonal, passing below the Ronda del Litoral and arriving at the new bridge over the River Besos.

It connects with other parts of the road network, Calle Sant Raimon de Penyafort, Calle del mar and a branch which joins Calle Llull.

The typical section is that of a broad avenue with three traffic lanes each way and a tramline in both directions.

The project is for the construction of an anti-DSU (Discharge from Unitary Systems) tank of 80,000 m3, so that the sediment produced can conveniently be sent to the Besós EDAR, reducing pollution spilled in the areas of Banos del Besos. Between ground level and the roof of the tank, and for a length of approx. 2/3 of the section between Prim and the bridge over the Ronda del Litoral, a parking lot is installed with capacity for around 450 places.

 
Civil Engineering Projects
© 2012 PAT CO. All Rights ReservedPowered by - Lumena Solution